Unity Acres Rehabilitation Center

This onsite design utilizes cutting edge microbial technology to stop wastewater from leaking onto the property of a 150-bed rehabilitation center with an aging septic system.

Read the full case study here.

 

SEASONAL RESORT

Improvements to the onsite treatment system of a seasonal resort were designed and drafted to accommodate an additional 8,000 GPD of generated wastewater.

Read the full case study here.

 

Joel's Front Yard Steakhouse

Rejuvenation of a failing mound system required installation of more advanced treatment equipment at this iconic restaurant in Verona, NY.

Read the case study here.

 

SUNSET RV PARK & CAMPGROUNDS

Replacing an old legacy septic system in a mobile home community.

Read the case study here.

 

PALMER POINT COTTAGES & BOAT RENTALS

Replacing an old legacy system at a seasonal vacation attraction in the heart of the Adirondacks.

Read the full case study here.

NORTHERN PINES MOBILE HOME PARK

Finding wastewater treatment solutions for over a dozen lots at this mobile home community.